The Global Plan — The Standard

One standard, from the factory to the border.

Each nation plans its own network. The MMC standard is what joins those networks: one specification for how a corridor is manufactured, founded, built, equipped, operated and connected across borders. A corridor built to the standard in one nation runs into a corridor built to the standard in the next without a change of system.

The whole design, in six parts.

The standard applies across the world and across the whole life of a corridor — the same modules, the same foundations, the same structures, the same services, the same construction method and the same operating rules in every nation.

01

Manufacture

Every corridor is assembled from the same factory-made precast modules, produced in Megafactories to one set of dimensions and tolerances. A module made in one nation fits a corridor in any other.

Manufacturing →
02

Foundations

Every pylon stands on the same foundation system: the Anchor Tension System, a drilled caisson with a cutter-head anchor and a tension tubular tensioned from the top of the structure.

The technology →
03

Structures

A fixed catalogue of structures covers every deployment: the MMC-VA, MMC-VB, MMC-VC and MMC-VD viaducts and the MMC-T transmission towers. Each nation chooses from the catalogue; it does not design new structures.

The model catalogue →
04

Services

Eleven MM Lines are carried on one structure: maglev passenger, electric freight rail, service rail, road, HVDC transmission, water, aqueduct, gas and liquid fuels, hydrogen, fibre and hyperloop. Each service has a standard position on the structure.

The MM Lines →
05

Construction

Foundations are drilled ahead; the topside is built span by span behind them, from the ground for the first spans and then from the completed line. Where a rail line, road or transmission line already exists, the corridor can follow it or run over it (advantage 15). Transmission towers are built with a crane and a work platform at the top of each tower.

How it is built →
06

Operation and borders

Trains, freight and services run through from one nation’s corridor into the next without a change of system. Through-running and border processing follow one procedure, set with the nations that join.

The international body →

A network is only as connected as its standard.

Rail networks built to different gauges, voltages, signalling and border rules stop at the border, or change trains there. A single standard lets freight and passengers move from one nation to the next on the same line, lets every nation buy from the same factories, and lets every nation’s workforce build to the same method.

The regional and continental network maps show what the standard joins: North America, Central America, South America, and Australia and its regional links. Memo 17 sets out what China’s high-speed network shows: a network built for passengers, with most freight left on the road. Memo 19 sets out the case for a global consortium to design and build the standard.

The written specification is in preparation.

The manufacturing, foundation, structure, service and construction parts of the standard are described on the pages linked above and in the memo series. The operating and border parts will be set with the nations that join, through the international body. The seven MMC patents are offered to every nation building to the global standard — see the patent family. To take part: join the standard.